Automotive and EV battery manufacturing plants place very different demands on an electrical distribution system from a conventional commercial facility. Large motors, welding equipment, compressors, HVAC systems, coating lines, automated production equipment, battery formation systems, test equipment, and other power-electronic loads may all operate within the same plant.
For this reason, selecting a power transformer for an automotive or battery manufacturing project is not simply a matter of matching the transformer kVA rating to the total connected load. The transformer has to fit the actual production process, load profile, installation environment, voltage level, expansion plan, and protection scheme.
As a China power transformer manufacturer, HONLE supplies oil-immersed and dry-type transformer solutions for industrial power distribution. For automotive plants and EV battery factories, we focus on how the transformer will operate inside the complete plant electrical system rather than treating it as an isolated piece of equipment.
Automotive and EV Battery Plants Need Power Distribution Built Around the Production Process
A modern vehicle plant may include stamping, body welding, painting, final assembly, utility systems, warehouses, laboratories, and office areas. An EV battery plant can add electrode preparation, coating and drying, cell assembly, formation and testing, environmental control, chilled-water systems, compressed air, and other process-specific loads.
These areas do not all use electricity in the same way.
A stamping workshop can have large motors and intermittent peaks. Robotic welding lines may contain many welding machines and power electronic devices. Painting and drying areas rely heavily on ventilation, pumps, temperature control, and process equipment. Battery production places additional emphasis on stable environmental control, precision equipment, charging and discharging systems, and continuous production.
The power transformer therefore needs to be selected around the actual load groups instead of a single plant-wide number.
For a new project, useful information includes:
- Incoming grid voltage and required secondary voltage
- Installed load and expected operating load by workshop
- Largest motors and their starting methods
- Welding, rectifier, VFD, UPS, charger, and other nonlinear loads
- Expected simultaneous demand
- Required redundancy
- Indoor or outdoor installation
- Ambient temperature, altitude, dust, humidity, and ventilation conditions
- Future production-line expansion
- Short-circuit and protection requirements
When these conditions are clear, the power transformer can be specified much more accurately.
Do Not Size the Power Transformer Only from the Sum of Nameplate Loads
Adding every machine nameplate together usually gives an installed-load figure, but it does not fully describe how the factory will operate.
Production equipment starts and stops at different times. Some loads operate continuously, some cycle with production, and others reach peak demand only during certain processes. HVAC and chilled-water systems may also change significantly with season and production rate.
A practical power transformer selection therefore considers both connected load and realistic simultaneous demand.
Oversizing every transformer excessively is not necessarily helpful. It increases equipment size and project cost and may leave the transformer operating at a very low load for long periods. On the other hand, selecting too little capacity can reduce expansion margin and increase thermal stress when production reaches its planned output.
For automotive and EV battery manufacturing plants, we normally recommend evaluating the load by workshop or process area first, then deciding how the transformers should be divided across the site.
This also makes future expansion easier. If a second production line, additional formation equipment, more compressors, or a new HVAC plant is expected, the electrical design can reserve practical capacity without forcing the first-stage installation to carry unnecessary equipment.
Large Motors and Repeated Starting Loads Affect Transformer Selection
Automotive factories contain many motor-driven systems: presses, conveyors, pumps, fans, compressors, cooling towers, dust collection equipment, and material-handling systems. Battery factories also depend heavily on HVAC, chilled water, vacuum, compressed air, pumps, and process exhaust.
Large motors can create a temporary voltage drop during starting, especially when several loads start within a short period.
The power transformer must therefore be considered together with the motor size, starting method, feeder arrangement, and allowable voltage drop. A direct-on-line motor, soft-started motor, and VFD-driven motor do not place the same demand on the electrical system.
This is especially important for auxiliary systems that support continuous production. If chilled-water pumps, exhaust fans, or compressors cannot start correctly after a shutdown or transfer operation, production may be delayed even though the transformer has enough steady-state kVA capacity.
The transformer rating is only one part of the decision. Transformer impedance, upstream system strength, cable length, motor-starting method, and downstream protection all influence the final result.
Welding Lines Can Create Fast-Changing Loads
Body shops use large numbers of welding machines, robots, and automated cells. Their demand can change quickly as different stations operate through the production cycle.
This type of load should not be treated in exactly the same way as a stable continuous motor load.
When we discuss a power transformer for an automotive welding workshop, we need to know the total welding capacity, duty cycle, expected simultaneity, distribution arrangement, and whether other sensitive equipment will share the same transformer.
In some projects, separating highly fluctuating production loads from sensitive control or utility loads can make the electrical system easier to manage. The exact arrangement depends on the plant layout and the required continuity of each process.
The objective is to prevent normal production cycles from causing unnecessary voltage disturbance elsewhere in the factory.
EV Battery Production Adds More Power-Electronic Loads
EV battery manufacturing introduces a large number of electronically controlled loads. Depending on the production process, these can include rectifiers, variable-frequency drives, UPS systems, charging and discharging equipment, automated test systems, and other converter-based equipment.
These loads can introduce harmonic current into the electrical system.
Harmonics matter because they can increase current and losses in transformers, cables, and other equipment. They can also affect voltage waveform quality when the system is not designed with the actual nonlinear load profile in mind.
A power transformer for an EV battery plant should therefore not be selected only from fundamental-frequency kW and kVA values. The project team should also identify major harmonic-producing equipment and confirm how harmonic mitigation will be handled at system level.
Depending on the project, that may involve equipment-level filtering, active or passive harmonic filters, suitable transformer design, load separation, or a combination of measures.
We do not assume one standard solution for every battery plant. The important point is to make the nonlinear load profile part of the transformer discussion from the beginning.
Voltage Stability Matters When Production Equipment Is Sensitive
Modern automotive and battery production lines depend on PLCs, robots, drives, test equipment, industrial computers, sensors, process controls, and automated inspection systems. Some equipment is more sensitive to voltage dips or disturbances than large conventional mechanical loads.
A stable factory power system therefore needs more than adequate transformer capacity.
The power transformer has to work with the incoming supply, switchgear, protective devices, cables, reactive-power compensation, harmonic-control equipment, and backup power strategy. If the plant has a large amount of sensitive equipment, it can also be useful to separate critical loads from heavy fluctuating loads where the system architecture allows it.
For battery manufacturing, loss of environmental control can also become a production issue. Dry rooms, HVAC systems, chilled-water systems, exhaust systems, and process controls may need different continuity priorities from general workshop loads.
That is why load classification should be completed before the transformer arrangement is finalized.
Oil-Immersed or Dry-Type Power Transformer?
Both oil-immersed and dry-type transformers can be used in industrial manufacturing projects, but they fit different installation conditions.
Oil-Immersed Transformers Suit Many Outdoor and Main-Substation Applications
For a large automotive or EV battery manufacturing campus, oil-immersed transformers are commonly considered for outdoor substations and higher-capacity distribution points. Their liquid insulation and cooling system provides effective heat dissipation and makes them well suited to continuous industrial duty when the installation conditions support this design.
HONLE supplies oil-immersed power transformer solutions for industrial distribution projects and different voltage requirements.
For an outdoor main substation, the discussion normally includes voltage ratio, rated capacity, impedance, cooling method, tap range, insulation level, protection accessories, environmental conditions, and interface requirements with the rest of the substation.

Dry-Type Transformers Fit Indoor Distribution Close to Production Areas
A dry-type power transformer is often a practical choice when the transformer is installed indoors, inside an electrical room, or closer to workshops where oil containment and fire-safety considerations make a dry design preferable.
HONLE supplies three-phase dry-type transformers using epoxy-resin cast construction for indoor distribution applications.
In an automotive or EV battery plant, dry-type units may be used for workshop distribution, utility buildings, production-area electrical rooms, or other indoor substations, depending on local codes and project design.
Ventilation still matters. A dry-type transformer installed in a hot or poorly ventilated electrical room can experience unnecessary thermal stress, so enclosure arrangement, airflow, ambient temperature, and clearances should be confirmed during design.

One Large Transformer or Several Transformers?
Large manufacturing campuses rarely have only one load characteristic. Dividing the plant into several transformer zones can provide operational and expansion advantages.
For example, separate transformers may serve:
- Stamping and heavy mechanical loads
- Body welding
- Paint shop and process ventilation
- Final assembly
- Battery cell production
- Formation and testing
- Chilled-water and compressed-air utilities
- Warehouses and general building services
This does not mean every process needs its own power transformer. The right number depends on plant size, voltage level, layout, reliability target, cable routing, and capital cost.
However, distributing capacity across several substations can limit the impact of a single outage, shorten low-voltage feeder distances, and make phased expansion easier.
For projects where production continuity is particularly important, two transformers with bus-tie or standby arrangements may also be considered. The transformer loading under both normal and contingency conditions should then be checked carefully.
Transformer Impedance Must Match Short-Circuit and Voltage-Drop Requirements
Transformer impedance affects both fault current and voltage behavior.
A lower impedance generally allows higher short-circuit current, which can increase the duty on downstream switchgear and busbars. A higher impedance can reduce fault current but may produce a larger voltage drop during motor starting or sudden load changes.
There is therefore no single impedance value that is automatically best for every factory.
When specifying a power transformer, transformer impedance should be coordinated with:
- Available short-circuit capacity from the utility
- Switchgear interrupting ratings
- Busbar withstand ratings
- Motor-starting requirements
- Feeder voltage-drop limits
- Protection settings
- Parallel transformer operation, if applicable
This becomes especially important in large automotive and battery manufacturing plants because the electrical network may contain both high-power equipment and sensitive automated production systems.
Parallel Operation Requires More Than Matching kVA
Some plants use transformers in parallel to increase operating flexibility or provide redundancy. If parallel operation is planned, it needs to be defined before the transformers are ordered.
The power transformer units must be compatible in key parameters such as voltage ratio, vector group, impedance, tap position, frequency, and phase sequence. Significant mismatch can cause circulating current or poor load sharing.
If the project is expected to expand in stages, it is also useful to tell us whether a future transformer is expected to operate in parallel with the first one.
That allows the original specification to consider future compatibility rather than treating expansion as an entirely separate project.
Future EV Production Expansion Should Be Included from the Beginning
Automotive plants continue to change as manufacturers add battery-electric models, battery pack assembly, higher levels of automation, additional charging infrastructure, or new production lines.
The electrical system should leave sensible room for these changes.
This does not mean selecting an oversized power transformer for every possible future load. A better approach is to identify realistic expansion stages and decide where spare transformer capacity, spare switchgear bays, reserved cable routes, or additional transformer positions will be most useful.
For example, a factory may begin with conventional vehicle assembly and later add battery pack production. Another site may start with one battery cell line and add a second formation area after production ramps up.
If these stages are known early, the transformer and substation layout can be planned so that expansion does not require unnecessary reconstruction of the original electrical system.
What Information Should You Send to a Power Transformer Manufacturer?
A useful transformer inquiry does not need to be complicated, but it should include enough information to understand the application.
For an automotive or EV battery manufacturing project, we recommend providing the following:
| Project Information | What to Confirm |
| Grid supply | Incoming voltage, frequency, system grounding |
| Required output | Secondary voltage and distribution arrangement |
| Load | Required kVA, expected operating load, peak demand |
| Motor loads | Largest motor sizes and starting methods |
| Nonlinear loads | VFDs, rectifiers, welding equipment, charging/discharging systems |
| Installation | Indoor/outdoor, enclosure, ventilation, available space |
| Environment | Ambient temperature, altitude, dust, humidity |
| Reliability | Normal operation, standby arrangement, redundancy requirements |
| Protection | Short-circuit level and switchgear ratings |
| Expansion | Planned future lines or additional production capacity |
With this information, we can discuss whether an oil-immersed or dry-type power transformer is more appropriate, what capacity range should be considered, and which electrical parameters need to be coordinated with the rest of the plant.
Working with HONLE on Automotive and EV Battery Manufacturing Plants
HONLE manufactures power transformer and related power-distribution equipment, with both oil-immersed and dry-type transformer options available for different installation conditions.
For automotive and EV battery manufacturing plants, we begin with the electrical requirements of the project and confirm how the transformer will connect with the rest of the distribution system.
That includes voltage ratio, capacity, impedance, tap requirements, cooling, insulation, installation environment, connection arrangement, accessories, and other project-specific requirements before production.
A power transformer in a manufacturing plant is expected to operate for years while production equipment around it changes, expands, and becomes more automated. For that reason, both the current load and the planned development of the factory should be considered before the final configuration is confirmed.
If you are planning a new automotive plant, EV battery factory, production-line expansion, or transformer replacement project, send us your single-line diagram, load list, voltage requirements, installation conditions, and expected expansion plan. We can review the application and prepare a suitable power transformer configuration for the project.

FAQ
What Type of Power Transformer Is Commonly Used in an Automotive Factory?
Both oil-immersed and dry-type transformers can be used. Outdoor main substations often use oil-immersed designs, while indoor workshop substations may use dry-type transformers depending on capacity, layout, local codes, and fire-safety requirements.
Does an EV Battery Factory Need a Special Transformer?
Not necessarily a completely different transformer type, but the load profile needs closer attention. Large numbers of VFDs, rectifiers, formation systems, test equipment, and other nonlinear loads can affect harmonics, losses, and overall electrical system design.
How Should Transformer Capacity Be Calculated for a Manufacturing Plant?
Capacity should be based on expected simultaneous operating load, load growth, starting conditions, and a practical reserve margin rather than simply adding every machine nameplate rating.
Can One Power Transformer Supply Both Heavy Machinery and Sensitive Production Equipment?
It can in some systems, but load fluctuation, voltage quality, harmonics, and continuity requirements should be checked. Large projects may benefit from separating certain load groups across different transformers or bus sections.
What Should Be Confirmed Before Ordering a Power Transformer from HONLE?
Please provide the primary and secondary voltages, frequency, required capacity, load characteristics, installation environment, cooling requirements, impedance or short-circuit requirements, tap range, connection group, and any project-specific standards or accessories.